M2400 Project Area
A mineral resource of 496,000 oz at a grade of 4.08 g/t Au was delineated at the end of 2009 drilling campaign over a strike length of 720 metres and to a depth of 270 metres from the surface. The mineralised lodes are between two and twelve metres wide (average five metres wide) and are hosted in sericitised and sheared siltstones with up to 10 to 15% pyrite, stibnite, tetrahedrite and arsenopyrite Drilling has indicated that the mineralisation is open along strike and down dip.

|
HoleID
|
Year
|
Section
|
|
Drilled From (metres)
|
Drilled To (metres)
|
Length (metres)
|
True width (metres)
|
Au (g/t)
|
|
dh 20
|
2005
|
2080
|
|
52.10
|
62.50
|
10.40
|
6.90
|
3.74
|
|
dh 20
|
2005
|
2080
|
incl
|
53.60
|
56.50
|
2.90
|
2.07
|
5.29
|
|
dh 20
|
2005
|
2080
|
incl
|
59.00
|
61.20
|
2.20
|
2.04
|
7.27
|
|
dh 20
|
2005
|
2080
|
|
75.00
|
78.00
|
3.00
|
2.29
|
7.48
|
|
dh 20
|
2005
|
2080
|
|
87.30
|
98.00
|
10.70
|
7.66
|
3.10
|
|
dh 20
|
2005
|
2080
|
incl
|
94.00
|
98.00
|
4.00
|
2.86
|
4.27
|
|
dh 124
|
2007
|
2080
|
|
104.50
|
113.50
|
9.00
|
4.46
|
3.02
|
|
dh 124
|
2007
|
2080
|
incl
|
104.50
|
107.50
|
3.00
|
1.49
|
4.45
|
|
dh 124
|
2007
|
2080
|
|
152.50
|
158.50
|
6.00
|
3.18
|
2.40
|
|
dh 124
|
2007
|
2080
|
|
164.50
|
169.00
|
4.50
|
1.72
|
3.39
|
|
dh 127
|
2007
|
2080
|
|
88.50
|
93.00
|
4.50
|
3.24
|
3.56
|
|
dh 127
|
2007
|
2080
|
|
127.50
|
130.50
|
3.00
|
2.49
|
2.70
|
|
dh 127
|
2007
|
2080
|
incl
|
139.50
|
142.50
|
3.00
|
2.55
|
5.56
|
|
dh 127
|
2007
|
2080
|
|
139.50
|
151.50
|
12.00
|
10.20
|
2.93
|
|
dh 127
|
2007
|
2080
|
incl
|
148.50
|
151.50
|
3.00
|
2.55
|
4.25
|
|
dh 127
|
2007
|
2080
|
|
159.00
|
162.00
|
3.00
|
2.95
|
2.66
|
|
dh 101
|
2007
|
2120
|
|
82.50
|
97.50
|
15.00
|
5.41
|
2.37
|
|
dh 101
|
2007
|
2120
|
|
135.00
|
171.00
|
36.00
|
19.11
|
5.23
|
|
dh 88
|
2006
|
2160
|
|
123.00
|
129.00
|
6.00
|
3.38
|
6.05
|
|
dh 88
|
2006
|
2160
|
|
189.00
|
195.00
|
6.00
|
2.88
|
3.27
|
|
dh 125bis
|
2007
|
2200
|
|
208.50
|
216.00
|
7.50
|
5.59
|
2.68
|
|
dh 125bis
|
2007
|
2200
|
|
249.00
|
255.00
|
6.00
|
4.70
|
2.06
|
|
dh 22
|
2005
|
2280
|
|
63.10
|
90.00
|
26.90
|
23.76
|
3.56
|
|
dh 22
|
2005
|
2280
|
incl
|
70.50
|
73.50
|
3.00
|
2.65
|
11.96
|
|
dh 22
|
2005
|
2280
|
incl
|
81.40
|
85.40
|
4.00
|
3.53
|
5.28
|
|
dh 98
|
2007
|
2280
|
|
106.00
|
115.00
|
9.00
|
7.01
|
3.59
|
|
dh 99
|
2007
|
2280
|
|
115.50
|
129.00
|
13.50
|
6.72
|
2.68
|
|
dh 01
|
2000
|
2360
|
|
78.50
|
87.00
|
8.50
|
6.84
|
4.65
|
|
dh 01
|
2000
|
2360
|
|
268.50
|
271.50
|
3.00
|
2.41
|
3.47
|
|
dh 14
|
2004
|
2440
|
|
81.70
|
91.20
|
9.50
|
4.78
|
3.22
|
|
dh 14
|
2004
|
2440
|
|
146.20
|
148.60
|
2.40
|
1.52
|
3.34
|
|
dh 17
|
2005
|
2440
|
|
25.00
|
37.50
|
12.50
|
9.48
|
4.52
|
|
dh 17
|
2005
|
2440
|
incl
|
25.00
|
30.30
|
5.30
|
4.02
|
7.39
|
|
dh 17
|
2005
|
2440
|
|
48.30
|
52.00
|
3.70
|
2.96
|
2.47
|
|
dh 17
|
2005
|
2440
|
|
99.50
|
102.50
|
3.00
|
3.00
|
2.21
|
|
dh 18
|
2005
|
2560
|
|
0.00
|
16.00
|
16.00
|
13.52
|
3.04
|
|
dh 18
|
2005
|
2560
|
incl
|
0.00
|
4.80
|
4.80
|
4.06
|
6.00
|
|
dh 18
|
2005
|
2560
|
|
35.50
|
48.50
|
13.00
|
10.85
|
2.55
|
|
dh 18
|
2005
|
2560
|
incl
|
37.00
|
40.00
|
3.00
|
2.50
|
4.13
|
|
dh 18
|
2005
|
2560
|
|
76.40
|
79.00
|
2.60
|
2.16
|
5.91
|
|
dh 18
|
2005
|
2560
|
|
87.50
|
90.50
|
3.00
|
2.64
|
2.26
|
|
dh 105
|
2007
|
2560
|
|
45.00
|
60.00
|
15.00
|
9.25
|
3.74
|
|
dh 105
|
2007
|
2560
|
incl
|
55.50
|
60.00
|
4.50
|
2.78
|
8.58
|
|
dh 105
|
2007
|
2560
|
|
72.00
|
76.50
|
4.50
|
3.32
|
2.60
|
|
dh 105
|
2007
|
2560
|
|
94.50
|
97.50
|
3.00
|
2.11
|
2.12
|
Table 2: M24 Significant Drill Hole Intersections.
M3000 Area


Figure 5: Surface Plan and Typical Drill Section: M3000
|
HoleID
|
Year
|
Section
|
|
Drilled From (metres)
|
Drilled To (metres)
|
Length (metres)
|
True width (metres)
|
Au(g/t)
|
|
dh 69
|
2006
|
2760
|
|
147.00
|
154.50
|
7.50
|
4.62
|
2.51
|
|
dh 70
|
2006
|
2760
|
|
144.00
|
148.50
|
4.50
|
4.50
|
2.05
|
|
dh 23
|
2005
|
2920
|
|
52.50
|
54.50
|
2.00
|
2.00
|
3.61
|
|
dh 23
|
2005
|
2920
|
|
134.00
|
138.50
|
4.50
|
3.27
|
3.95
|
|
dh 24
|
2005
|
2920
|
|
148.50
|
189.00
|
40.50
|
30.29
|
3.50
|
|
dh 24
|
2005
|
2920
|
incl
|
150.00
|
153.00
|
3.00
|
2.24
|
7.32
|
|
dh 24
|
2005
|
2920
|
incl
|
160.50
|
163.50
|
3.00
|
2.24
|
4.82
|
|
dh 24
|
2005
|
2920
|
incl
|
172.50
|
178.00
|
5.50
|
4.11
|
11.47
|
|
dh 24
|
2005
|
2920
|
incl
|
172.50
|
175.50
|
3.00
|
2.24
|
19.65
|
|
dh 24
|
2005
|
2920
|
|
199.00
|
204.00
|
5.00
|
4.17
|
4.33
|
|
dh 24
|
2005
|
2920
|
|
210.00
|
214.50
|
4.50
|
3.75
|
3.37
|
|
dh 24
|
2005
|
2920
|
|
217.50
|
220.00
|
2.50
|
2.08
|
2.04
|
|
dh 128
|
2007
|
2920
|
|
111.00
|
147.00
|
36.00
|
20.49
|
5.40
|
|
dh 128
|
2007
|
2920
|
incl
|
126.00
|
141.00
|
15.00
|
10.26
|
10.60
|
|
dh 128
|
2007
|
2920
|
|
168.00
|
171.00
|
3.00
|
2.30
|
4.13
|
|
m 302
|
2008
|
2920
|
|
37.50
|
42.00
|
4.50
|
2.80
|
8.15
|
|
m 302
|
2008
|
2920
|
|
49.50
|
52.50
|
3.00
|
1.58
|
2.84
|
|
m 302
|
2008
|
2920
|
|
174.00
|
180.00
|
6.00
|
3.39
|
2.79
|
|
m 302
|
2008
|
2920
|
|
204.00
|
208.50
|
4.50
|
2.91
|
2.55
|
|
dh 03
|
2000
|
2960
|
|
124.50
|
135.50
|
11.00
|
8.26
|
5.48
|
|
dh 03
|
2000
|
2960
|
incl
|
127.20
|
131.70
|
4.50
|
3.38
|
11.13
|
|
dh 03
|
2000
|
2960
|
|
149.00
|
151.20
|
2.20
|
2.20
|
3.14
|
|
dh 03
|
2000
|
2960
|
|
202.20
|
214.60
|
12.40
|
6.09
|
2.66
|
|
dh 03
|
2000
|
2960
|
|
202.20
|
205.10
|
2.90
|
1.42
|
5.02
|
|
dh 25
|
2005
|
2960
|
|
69.00
|
75.00
|
6.00
|
4.66
|
1.99
|
|
dh 25
|
2005
|
2960
|
|
209.00
|
220.00
|
11.00
|
5.32
|
2.10
|
|
dh 26
|
2005
|
3000
|
|
7.10
|
12.00
|
4.90
|
4.50
|
2.32
|
|
dh 26
|
2005
|
3000
|
|
124.70
|
138.70
|
14.00
|
13.78
|
3.97
|
|
dh 26
|
2005
|
3000
|
incl
|
124.70
|
130.50
|
5.80
|
5.71
|
4.81
|
|
dh 26
|
2005
|
3000
|
incl
|
135.00
|
137.50
|
2.50
|
2.46
|
4.28
|
|
dh 27
|
2005
|
3000
|
|
182.00
|
185.00
|
3.00
|
2.50
|
4.26
|
|
dh 27
|
2005
|
3000
|
|
207.00
|
228.00
|
21.00
|
15.00
|
3.66
|
|
dh 16
|
2004
|
3080
|
|
143.80
|
169.20
|
25.40
|
16.51
|
2.72
|
|
dh 28
|
2005
|
3080
|
|
105.00
|
121.00
|
16.00
|
14.83
|
5.26
|
|
dh 28
|
2005
|
3080
|
incl
|
106.30
|
112.00
|
5.70
|
5.28
|
7.44
|
|
dh 28
|
2005
|
3080
|
incl
|
116.00
|
118.00
|
2.00
|
1.85
|
11.20
|
|
dh 30
|
2005
|
3080
|
|
161.00
|
166.00
|
5.00
|
3.71
|
2.79
|
|
dh 30
|
2005
|
3080
|
incl
|
164.00
|
166.00
|
2.00
|
1.48
|
4.70
|
|
dh 30
|
2005
|
3080
|
|
188.00
|
200.00
|
12.00
|
10.73
|
2.14
|
|
dh 30
|
2005
|
3080
|
|
223.00
|
232.00
|
9.00
|
7.65
|
2.99
|
|
dh 30
|
2005
|
3080
|
incl
|
230.00
|
232.00
|
2.00
|
1.70
|
5.47
|
|
dh 30
|
2005
|
3080
|
|
236.00
|
240.00
|
4.00
|
3.77
|
2.35
|
|
dh 30
|
2005
|
3080
|
|
257.00
|
259.00
|
2.00
|
1.85
|
2.32
|
|
dh 29
|
2005
|
3120
|
|
82.80
|
85.50
|
2.70
|
2.68
|
2.88
|
|
dh 29
|
2005
|
3120
|
|
126.00
|
128.00
|
2.00
|
1.83
|
2.48
|
|
dh 29
|
2005
|
3120
|
|
146.80
|
176.00
|
29.20
|
27.22
|
3.60
|
|
dh 29
|
2005
|
3120
|
incl
|
160.00
|
167.00
|
7.00
|
6.53
|
6.06
|
|
dh 29
|
2005
|
3120
|
incl
|
162.00
|
165.00
|
3.00
|
2.80
|
7.57
|
|
dh 31
|
2005
|
3160
|
|
50.00
|
54.10
|
4.10
|
3.38
|
2.39
|
|
dh 31
|
2005
|
3160
|
|
144.00
|
150.20
|
6.20
|
4.94
|
3.53
|
|
dh 31
|
2005
|
3160
|
incl
|
144.00
|
147.00
|
3.00
|
2.39
|
4.48
|
Table 3: M3000 Significant Drill Hole Interceptions.
Back to TopA mineral resource of 134,000 oz at a grade of 4.17 g/t Au was delineated at the end of the 2009 drilling campaign over a strike length of 300 metres and to a depth of 250 metres from the surface. The mineralisation is between two and twelve metres wide (average width 4.18 metres). As in other Main Zone project areas, the mineralisation is hosted in steeply dipping lodes of sericitised and sheared siltstones and greywackes with up to 10 to 15% pyrite, stibnite, tetrahedrite and arsenopyrite Drilling has indicated that the mineralisation is open along strike to the north and down dip.
|
HoleID
|
Year
|
Section
|
|
Drilled From (metres)
|
Drilled To (metres)
|
Length (metres)
|
True width (metres)
|
Au (g/t)
|
|
dh 04
|
2000
|
3360
|
|
94.00
|
100.00
|
6.00
|
6.00
|
3.13
|
|
dh 04
|
2000
|
3360
|
|
124.00
|
136.00
|
12.00
|
11.80
|
3.12
|
|
dh 72
|
2006
|
3360
|
|
111.50
|
118.00
|
6.50
|
6.33
|
4.00
|
|
dh 72
|
2006
|
3360
|
|
154.00
|
158.50
|
4.50
|
4.50
|
3.69
|
|
M3416
|
2008
|
3400
|
|
171.60
|
174.60
|
3.00
|
1.27
|
3.23
|
|
dh 71
|
2006
|
3440
|
|
125.50
|
134.50
|
9.00
|
9.00
|
3.26
|
|
dh 71
|
2006
|
3440
|
incl
|
125.50
|
128.50
|
3.00
|
3.00
|
7.24
|
|
dh 71
|
2006
|
3440
|
|
214.00
|
215.50
|
1.50
|
1.50
|
5.19
|
|
dh 71 bis
|
2006
|
3440
|
|
3.00
|
10.50
|
7.50
|
7.50
|
6.62
|
|
dh 71 bis
|
2006
|
3440
|
incl
|
6.00
|
9.00
|
3.00
|
3.00
|
10.08
|
M3900 Area
|
HoleID
|
Year
|
Section
|
|
Drilled From (metres)
|
Drilled To (metres)
|
Length (metres)
|
True width (metres)
|
Au (g/t)
|
|
dh 05
|
2000
|
3550
|
|
97.00
|
100.00
|
3.00
|
3.00
|
2.82
|
|
dh 38
|
2005
|
3680
|
|
43.80
|
56.00
|
12.20
|
10.32
|
2.21
|
|
dh 38
|
2005
|
3680
|
incl
|
43.80
|
47.00
|
3.20
|
2.71
|
3.53
|
|
dh 38
|
2005
|
3680
|
|
62.00
|
67.00
|
5.00
|
4.21
|
2.22
|
|
dh 37
|
2005
|
3760
|
|
84.00
|
90.00
|
6.00
|
5.52
|
2.65
|
|
dh 37
|
2005
|
3760
|
|
100.50
|
114.00
|
13.50
|
13.50
|
3.08
|
|
dh 37
|
2005
|
3760
|
incl
|
106.50
|
109.50
|
3.00
|
3.00
|
8.73
|
|
dh 37
|
2005
|
3760
|
|
132.00
|
139.50
|
7.50
|
6.85
|
4.27
|
|
dh 37
|
2005
|
3760
|
incl
|
132.00
|
136.50
|
4.50
|
4.11
|
5.25
|
|
dh 37
|
2005
|
3760
|
|
147.00
|
150.00
|
3.00
|
2.93
|
2.55
|
|
dh 37
|
2005
|
3760
|
|
165.30
|
168.50
|
3.20
|
3.00
|
2.20
|
|
dh 36
|
2005
|
3840
|
|
0.00
|
2.00
|
2.00
|
1.88
|
4.57
|
|
dh 36
|
2005
|
3840
|
|
86.00
|
90.00
|
4.00
|
3.54
|
3.13
|
|
dh 36
|
2005
|
3840
|
|
158.00
|
162.00
|
4.00
|
3.71
|
2.08
|
|
dh 12
|
2004
|
3920
|
|
41.50
|
50.10
|
8.60
|
4.41
|
3.37
|
|
dh 12
|
2004
|
3920
|
|
160.00
|
164.00
|
4.00
|
1.83
|
3.34
|
|
dh 13
|
2004
|
3920
|
|
73.10
|
79.00
|
5.90
|
3.35
|
2.46
|
|
dh 35
|
2005
|
3920
|
|
19.00
|
29.50
|
10.50
|
6.23
|
3.39
|
|
dh 35
|
2005
|
3920
|
|
78.00
|
82.50
|
4.50
|
4.50
|
2.01
|
|
dh 34
|
2005
|
3980
|
|
52.50
|
56.00
|
3.50
|
2.66
|
4.55
|
|
dh 34
|
2005
|
3980
|
|
61.00
|
67.00
|
6.00
|
3.15
|
4.29
|
|
dh 34
|
2005
|
3980
|
incl
|
64.00
|
67.00
|
3.00
|
1.58
|
6.60
|
|
dh 34
|
2005
|
3980
|
|
73.00
|
76.00
|
3.00
|
1.53
|
3.61
|
|
dh 34
|
2005
|
3980
|
|
97.00
|
106.00
|
9.00
|
5.78
|
2.03
|
|
dh 33
|
2005
|
4080
|
|
37.00
|
41.50
|
4.50
|
4.50
|
6.17
|
|
dh 33
|
2005
|
4080
|
|
114.00
|
117.00
|
3.00
|
3.00
|
3.22
|
Table-5 : M3900 Significant Drill hole intersections.
